Fuel Pump Maintenance and Repair
Here is the list of items which has been changed during service; No Name Quantity Unit 1 PUMP ELEMENT (BOSCH) 8 PCS 2 PUMP VALVE (BOSCH)...
ICCP AFT&FWD AND MGPS SYSTEMS RENEWALS AND GENERAL CHECKS&REPAIR OPERATION
System: ICCP AFT&FWD AND MGPS SYSTEMS Manufacturer: CATHELCO LTD Work Undertaken: ICCP AFT&FWD AND MGPS SYSTEMS RENEWALS AND GENERAL...
Stern Tube Seals Service & Bonding
STERN Rope guards cut/removed. Scaffolding installed. After bonding team completed their job, the old rope guard re-welded and the...
562,5kW Alternator Repair / Rewinding
SPEED 900 minˉ¹ r.p.m A/V 738 A - 440 V BEARING 6328 C3 / 6328 C3 COSØ 0,8 INS 500 ϺΩ WORKS DONE:...
Repair and Overhaul of 200/135m3/hr capacity PVHB125-50 BV 1505018 Fire and General service pump
Dismantling the pump in the workshop After dismantling the pump, we noticed the pump case was corroded. Furthermore, pump shaft, bearing,...
Repair and Overhaul of 435m3/hr capacity Shinko SVA250S Ballast pump.
Dismantling the pump in the workshop After dismantling the pump we noticed pump case corroded pump shaft, bearing bush ,...
Special Production of Hydraulic Jack
Special Production of Hydraulic Jack (as per sample landed from vessel)
Manufacturing Windlass Main Bearing
Mooring Winch PORT/STBD Windlass Special Production of Main Bearing marine bronze