Masters and Owners of “CALM BAY”
JOB TITLE: Carrying out NDT of 15% Slewing Bolts + Load Test
ABS surveyor requested %15 of slewing bolts to be tested, so 22 pcs bolts removed from crane no 1,2,3,4.
NDT test for Cargo crane no 3 bolts completed successfully in from of the ABS surveyor on 14.08.2016.
NDT test for Cargo crane no 1,2,4 bolts completed successfully in from of the ABS surveyor on 15.08.2016.
Load Test completed for crane no 1,2,3,4 and provision crane successfully in from of the ABS surveyor.